Sort of. To the south we have Nelson dock. (where the arrow is pointing in the second pic of my first post today).
That WILL be a big plaza type place.
Problem is that it's also enclosed by the dockwall - to it's south is another dock that turns into a canal so is covered by a bridge. No entry that way.

To the north is a half tide dock and a working dockside (I think Wellington dock has been filled in now). But that wall stretches a long way north. There are plenty of gates and holes (in fact, there is a repaired part of the wall just to the north now:

(that gate in the background is the the green cross from earlier).

But it would start becoming financially unsound to buy/renovate longer and longer 'water-side-of-the-wall' pathways stretching off.

(Maybe the best thing we could do as Evertonians is to get our HGV licences and have 'accidents at strategic points in this wall.

Bet this is why it is taking so long. Dan Meis is just sat there with 9,000 variations of the approach; all with a shitting great wall in the middle he cannot get rid of.
Yes, we're being condescending. Yes, that means we're talking down to you.